Loading tanks 1 and 2
Moving to tanks 3 and 4
Passivation Instructions steps
Switch the “COVER” Knob to open tank 1 (Acid Tank)
Hit the “UP” button to bring pallet platform up above the acid
Check if Acid is up to correct temperature
Place up to 4 pallets onto the platform
Press Green Button to start passivation process.
Determine pump status based on part size and type. (Small collets = no pump)
Transfer passivated pallets to tank 2 (DI Water rinse 1)
Hit the “UP” button to bring pallet platform above water
Place up to 4 pallets onto the platform
Press green button to start rinse process
Repeat process for second rinse tank (Tank 3)
Remove pallets from second rinse tank and place in dryer
Blow off extra water with compressed air.
Start dryer (Tank 4)
Check if parts are dry. Most parts will be dry prior to full dryer cycle time
Remove from dryer and record part number, shop order, and quantity on tally sheet
Replace ticket clip from crest before sending to further processes and shipping.