Passivation Instructions

 

Loading tanks 1 and 2

Moving to tanks 3 and 4

 

 Passivation Instructions steps

  1. Switch the “COVER” Knob to open tank 1 (Acid Tank) 

  2. Hit the “UP” button to bring pallet platform up above the acid 

  3. Check if Acid is up to correct temperature

  4. Place up to 4 pallets onto the platform 

  5. Press Green Button to start passivation process. 

  6. Determine pump status based on part size and type. (Small collets = no pump) 

  7. Transfer passivated pallets to tank 2 (DI Water rinse 1) 

  8. Hit the “UP” button to bring pallet platform above water

  9. Place up to 4 pallets onto the platform 

  10. Press green button to start rinse process 

  11. Repeat process for second rinse tank (Tank 3) 

  12. Remove pallets from second rinse tank and place in dryer 

  13. Blow off extra water with compressed air.

  14. Start dryer (Tank 4)

  15. Check if parts are dry. Most parts will be dry prior to full dryer cycle time 

  16. Remove from dryer and record part number, shop order, and quantity on tally sheet 

  17. Replace ticket clip from crest before sending to further processes and shipping. 


Passivation Layout Diagram